Agency

Agency is one part of the business of Pupuk Indonesia Niaga with product services, namely the construction of Power Plants (Power Plant), Substations (Substation), and high voltage transmission networks and extra height (Transmission Line) with the scope of EPCC work (Engineering, Procurement, Construction, & Commissioning). As well as Electrical Material Supply for Agency business.

In this business sector, Pupuk Indonesia Niaga has been certified for ISO 9001:2015 Quality Management and OHSAS 18001:2007, including with certified competency of all business personnel.

For further information, please contact PT Pupuk Indonesia Niagaa via WA.

A. Power Plant

1. PLTD Kambang 2 x 600 KW
2. Exciter Modification Hydro Power Plant (PLTA) Cijendil
3. Rehabilitation & Modification Electrical in PLTA Ir. H. Juanda Hydro Power Plant
4. Over Haul Air Cooler, PLTA Ir. H. Juanda – Purwakarta
5. Civil Pondasi Rock Muffer & Fasilities PLTPB Dieng – Wonosobo
6. PLTG Kaltim (Peaking) 2 x (50-60)MW

B. Substations

1. 150 kV Salak Substation and Sidikalang Extension
2. 150 kV Negeri Dolok Substation and Galang Extension
3. 275 kV Simangkuk Substation

C. Transmission Line

  1. Transmission Line 500 kV Cirata – Cibatu
  2. Transmission Line 500 kV Cirata Intersection
  3. Transmission Line 500 kV Klaten – New Rawalo – Tasikmalaya
  4. Transmission Line 500 kV Lot 13 to III Tanjung Jati - Ungaran
  5. Transmission Line 275 kV Galang – Binjai
  6. Transmission Line 275 kV Padang Sidempuan – Payakumbuh
  7. Transmission Line 275 kV Quadruple 2 CCT Zebra Gumawang – GITET Lampung I section 6
  8. Reconductoring 150 KV Tripe – Tuban
  9. Reconductoring 150 KV Kosambi Baru – Bekasi
  10. Uprating Transmission Line 70 kV to 150 kV Lembursitu – Cianjur
  11. Uprating Transmission Line 70 kV to 150 kV Cibinong – Gandaria
  12. Transmission Line 150 kV Tanggung – Purwodadi
  13. Transmission Line 150 kV Probolinggo – Gending – Kraksan
  14. Transmission Line 150 kV Langsa – Tualang Cut
  15. Transmission Line 150 kV Cempaka – Barikin
  16. Transmission Line 150 kV Batam Island (P.1)
  17. Transmission Line 150 kV Sanur – Gianyar
  18. Transmission Line 150 kV Idie – Lhokseumawe
  19. Transmission Line 150 kV Duri – Bagan Batu
  20. Transmission Line 150 kV Bulukumba – Watampone
  21. Transmission Line 150 KV Mandiracang – Cikijing
  22. Transmission Line 150 KV Lot II Surabaya – Kediri
  23. Transmission Line 150 KV Mempawah – Singkawang
  24. Transmission Line 150 kV Painan – Limau Manis
  25. Transmission Line 150 kV LOT 11 New Kediri
  26. Transmission Line 150 kV Bangko – Merangin section SM Panco – Bunga Tanjung
  27. Transmission Line 150 kV Tanjung Jati – Sayung section 5
  28. Transmission Line 150 kV Curup – Pulau Baai section 2
  29. Transmission Line 150 kV Buntok – Muara Teweh
  30. Transmission Line 150 kV Labuan Bajo – Ruteng
  31. Transmission Line 150 kV Kayutangi – Barikin section 1
  32. Transmission Line 150 kV Hasang Hydro-Electric Power Plant
  33. Transmission Line 150 kV Ketapang – Sukadana section 1
  34. Transmission Line 150 kV Ketapang – Sukadana section 2
  35. Transmission Line 150 kV Ketapang – Sukadana section 3
  36. Transmission Line 150 kV PLTP Rantau Dadap – GI Lumut Balai
  37. Transmission Line 115 kV North Duri – Central Duri Switchyard
  38. Transmission Line 70 kV Seputih Banyak – Dipasena

D. Other Electrical, Mechanical, Maintenance, & Civil Works

  1. Turbin Maintenance for PT Pupuk Kujang Factory
  2. Building Construction E/M Installation for Gedung STO Digital in Medan
  3. Building Construction for service building in Dr. M. Jamil Central Hospital in Padang
  4. Building Construction of PT INTI Headquarter Building in Bandung
  5. Building Construction & other facilities for Laboratorium MIPA IKIP Padang
  6. Building Construction E/M Installation for STO Bangkalan
  7. E/M & Comm. Installation on Post Office Hq. Building in Bandung
  8. Container Yarg Expansion in Bom Baru Port in Palembang
  9. Tank Repairing for PERTAMINA RU IV
  10. The Plant Maintenance Unit Work & Skilled Scraftsman Services Works for PT Arun NGL
  11. Maintenance & Isolation Replacement Plant Area Zone I/II/II
  12. Installation & Procurement Hydroblast
  13. Distribution Line in Mojokerto, Bojonegoro, Madiun
  14. Distribution Line in Magelang
  15. Distribution Line in Solo
  16. Telephone Line for Sibolagit, R. Rapat, Mtangkuli and Gaudong
  17. Telephone Line in Gombong, Purworwjo & Muntilan
  18. Telephone Line in Tuban
  19. Telephone Line for T. Bayur, Secincin, B. Selasa, Lb. Basung, Padang
  20. Supply & Inst. For Distribution Line, Switchyard and cubicle in Jambi
  21. Rural Power Distribution Line in Sukabumi
  22. Cable Feeder 13.8 kV Installation Line in Cilacap
  23. 3 KM Pipe Line Installation for Gas Pipe, Porong
  24. Gas Transmission and Distribution
  25. Maintenance Mechanical & Electrical PT Badak NGL
  26. Modernisation Banjir Canal Water Intake
  27. Concrete work package – 10 Balongan Blue Sky Project
  28. Civil Works CO2 Remuval Subang I, II, III

Customer

pelanggan-megaeltra

Project

Jaskon PLTG Kaltim Project

Substation Project

Proyek Transmission Line