Agency
Agency is one part of the business of Pupuk Indonesia Niaga with product services, namely the construction of Power Plants (Power Plant), Substations (Substation), and high voltage transmission networks and extra height (Transmission Line) with the scope of EPCC work (Engineering, Procurement, Construction, & Commissioning). As well as Electrical Material Supply for Agency business.
In this business sector, Pupuk Indonesia Niaga has been certified for ISO 9001:2015 Quality Management and OHSAS 18001:2007, including with certified competency of all business personnel.
For further information, please contact PT Pupuk Indonesia Niagaa via WA.
A. Power Plant
1. PLTD Kambang 2 x 600 KW
2. Exciter Modification Hydro Power Plant (PLTA) Cijendil
3. Rehabilitation & Modification Electrical in PLTA Ir. H. Juanda Hydro Power Plant
4. Over Haul Air Cooler, PLTA Ir. H. Juanda – Purwakarta
5. Civil Pondasi Rock Muffer & Fasilities PLTPB Dieng – Wonosobo
6. PLTG Kaltim (Peaking) 2 x (50-60)MW
B. Substations
1. 150 kV Salak Substation and Sidikalang Extension
2. 150 kV Negeri Dolok Substation and Galang Extension
3. 275 kV Simangkuk Substation
C. Transmission Line
- Transmission Line 500 kV Cirata – Cibatu
- Transmission Line 500 kV Cirata Intersection
- Transmission Line 500 kV Klaten – New Rawalo – Tasikmalaya
- Transmission Line 500 kV Lot 13 to III Tanjung Jati - Ungaran
- Transmission Line 275 kV Galang – Binjai
- Transmission Line 275 kV Padang Sidempuan – Payakumbuh
- Transmission Line 275 kV Quadruple 2 CCT Zebra Gumawang – GITET Lampung I section 6
- Reconductoring 150 KV Tripe – Tuban
- Reconductoring 150 KV Kosambi Baru – Bekasi
- Uprating Transmission Line 70 kV to 150 kV Lembursitu – Cianjur
- Uprating Transmission Line 70 kV to 150 kV Cibinong – Gandaria
- Transmission Line 150 kV Tanggung – Purwodadi
- Transmission Line 150 kV Probolinggo – Gending – Kraksan
- Transmission Line 150 kV Langsa – Tualang Cut
- Transmission Line 150 kV Cempaka – Barikin
- Transmission Line 150 kV Batam Island (P.1)
- Transmission Line 150 kV Sanur – Gianyar
- Transmission Line 150 kV Idie – Lhokseumawe
- Transmission Line 150 kV Duri – Bagan Batu
- Transmission Line 150 kV Bulukumba – Watampone
- Transmission Line 150 KV Mandiracang – Cikijing
- Transmission Line 150 KV Lot II Surabaya – Kediri
- Transmission Line 150 KV Mempawah – Singkawang
- Transmission Line 150 kV Painan – Limau Manis
- Transmission Line 150 kV LOT 11 New Kediri
- Transmission Line 150 kV Bangko – Merangin section SM Panco – Bunga Tanjung
- Transmission Line 150 kV Tanjung Jati – Sayung section 5
- Transmission Line 150 kV Curup – Pulau Baai section 2
- Transmission Line 150 kV Buntok – Muara Teweh
- Transmission Line 150 kV Labuan Bajo – Ruteng
- Transmission Line 150 kV Kayutangi – Barikin section 1
- Transmission Line 150 kV Hasang Hydro-Electric Power Plant
- Transmission Line 150 kV Ketapang – Sukadana section 1
- Transmission Line 150 kV Ketapang – Sukadana section 2
- Transmission Line 150 kV Ketapang – Sukadana section 3
- Transmission Line 150 kV PLTP Rantau Dadap – GI Lumut Balai
- Transmission Line 115 kV North Duri – Central Duri Switchyard
- Transmission Line 70 kV Seputih Banyak – Dipasena
D. Other Electrical, Mechanical, Maintenance, & Civil Works
- Turbin Maintenance for PT Pupuk Kujang Factory
- Building Construction E/M Installation for Gedung STO Digital in Medan
- Building Construction for service building in Dr. M. Jamil Central Hospital in Padang
- Building Construction of PT INTI Headquarter Building in Bandung
- Building Construction & other facilities for Laboratorium MIPA IKIP Padang
- Building Construction E/M Installation for STO Bangkalan
- E/M & Comm. Installation on Post Office Hq. Building in Bandung
- Container Yarg Expansion in Bom Baru Port in Palembang
- Tank Repairing for PERTAMINA RU IV
- The Plant Maintenance Unit Work & Skilled Scraftsman Services Works for PT Arun NGL
- Maintenance & Isolation Replacement Plant Area Zone I/II/II
- Installation & Procurement Hydroblast
- Distribution Line in Mojokerto, Bojonegoro, Madiun
- Distribution Line in Magelang
- Distribution Line in Solo
- Telephone Line for Sibolagit, R. Rapat, Mtangkuli and Gaudong
- Telephone Line in Gombong, Purworwjo & Muntilan
- Telephone Line in Tuban
- Telephone Line for T. Bayur, Secincin, B. Selasa, Lb. Basung, Padang
- Supply & Inst. For Distribution Line, Switchyard and cubicle in Jambi
- Rural Power Distribution Line in Sukabumi
- Cable Feeder 13.8 kV Installation Line in Cilacap
- 3 KM Pipe Line Installation for Gas Pipe, Porong
- Gas Transmission and Distribution
- Maintenance Mechanical & Electrical PT Badak NGL
- Modernisation Banjir Canal Water Intake
- Concrete work package – 10 Balongan Blue Sky Project
- Civil Works CO2 Remuval Subang I, II, III
Customer
Project
Jaskon PLTG Kaltim Project
Substation Project
Proyek Transmission Line